CleanSpark is in the early stages of exploring a potential data center in Bullhead City. This site lays out the facts.

What's being built

A long-term investment in a community that's ready for it.

This campus will be a multi-year build, investing an initial $2.7+ billion dollars into Mohave County, creating numerous construction jobs and 100+ permanent full time opportunities without straining the grid, local water supply, or impacting local utility rates.

This campus will draw from the existing electric grid. Mohave Electric Cooperative is the energy provider for this development, in coordination with Arizona Electric Power Cooperative. Preliminary studies have confirmed the availability of electric capacity to support this project. CleanSpark is committed to covering our own energy costs, ensuring residential bills are not impacted by the data center.

Project facts

Investment

$2.7+ billion initially

Construction timeline

2027 – 2028

Site

Bullhead City, AZ

Campus capacity

Approximately 300 MW

Community investment

This project will provide a significant boost to local jobs, tax revenue, and the broader community. Our preliminary economic impact report estimates that construction alone will support 1,202 jobs and generate $33.5 million annually in revenue for state, county, and local governments. Once operational, the project is expected to support 272 local jobs, generate more than $76.5 million in annual economic output, and provide $35 million annually in revenue to state, county, and local governments.

The largest local allocations include approximately $7.8 million for the Mohave County Fire District, $4 million for Colorado River Union High School District #2, and $3.3 million for Bullhead Elementary School District #15.

We have committed an additional $10 million to support local communities across the Mohave Electric Cooperative service area.

It is natural to have questions about the impact of new development. However, as Tech Trends 24/7 notes, modern data centers consistently prove to be strong, long-term partners in both rural and urban communities.

The biggest myths about data centers conflict with the truth.

The common misconception is on the left. The truth is on the right.

The Claim

“Data centers are noisy.”

What the Data Shows

Modern data centers are designed with noise mitigation as a core engineering consideration. Before construction begins, acoustic studies, equipment selection, site layouts, setbacks, and sound attenuation measures are often incorporated to help facilities comply with local ordinances and permitting requirements. Data centers must meet applicable local regulations governing sound levels and community impacts.

The servers are liquid-cooled in a closed loop, so there are no high-velocity fans. At 100 yards the facility measures about 60 dBA, the level of a normal conversation, and it is effectively inaudible at a mile. Total sound output is in line with a standard office building.

View sound fact sheet

The Claim

“They'll drain our water.”

What the Data Shows

Modern data centers must remove heat generated by computing equipment to operate safely and reliably. While cooling is essential, water use varies significantly based on system design. Our facility will use a modern closed-loop system that is filled once and continuously recirculates that water.

Total average use is approximately 1.5 acre-feet per year, including restrooms and maintenance, roughly 95 times less than an average golf course. There is no daily evaporative water consumption.

View water fact sheet

The Claim

“Bright lights will shine all night long.”

What the Data Shows

Data centers do not require stadium-style lighting to operate safely. Modern facilities can be designed with targeted, controlled, and shielded lighting that supports security while minimizing impacts on neighbors, wildlife, and the night sky. Responsible lighting design helps ensure the facility is a good neighbor while maintaining safe operations around the clock.

Exterior lighting will be downward-facing, dark-sky shielded, and motion-activated. Server rooms run in near-darkness, and the facility is largely unmanned overnight.

View lighting fact sheet

The Claim

“Traffic will be a nightmare.”

What the Data Shows

Designated haul routes, restricted hours for heavy trucks, and posted speed limits keep local roads moving. Operations employ about 100 staff on staggered shifts, far less concentrated than a typical employer of that size.

A proven community partner

Hear from the neighbors CleanSpark already lives next to.

CleanSpark has spent four years investing in Sandersville, Georgia. Local leaders share what that partnership has meant for their community.

Sandersville, Georgia

Answers to common questions.

Contact Us

Questions about CleanSpark's potential data center campus in Bullhead City? Send a note and the team will follow up.